More Top Stories:

Middle Tennessee Weekly Construction Lane Closures, November 23-29, 2017

Wednesday, November 22, 2017 | 1:21pm

***All construction related lane closures will be stopped beginning at noon on Wednesday, November 22, 2017 through 6:00 a.m. Monday, November 27, 2017. “Daily” and “Nightly” lane closures on this report will be halted during this time period and resume on Monday, November 27. ***

DAVIDSON COUNTY, Resurfacing on I-24 from SR 6 to the I-40 Westbound Ramps and Bridge Rehab on I-24 Over Spring Street and Oldham Street (M.M. 47 – 48)

  • Nightly, 8PM-5AM, There will be alternating lane closures on Spring Street and Oldham Street.

DAVIDSON COUNTY, The Improvement Of The Intersection On SR 1 (US 70S) At McCrory Lane & The CSX Railroad (L.M. 0.99)

  • Daily (excluding weekends) 9AM-3:30PM, There will be alternating lane closures for grading and storm drainage.

DAVIDSON COUNTY, Resurfacing On SR 155 (Briley Pkwy) From The Bridge Over Two Rivers Pkwy (L.M. 10.08) To West Of The McGavock Pike Ramp (L.M. 12.18)

  • Nightly (excluding weekends), 8PM-5AM, There will be alternating lane closures on SR 155 in both directions for installation of guardrail. One lane will remain open at all times.

DAVIDSON COUNTY, Grading, Drainage, Signals, & Paving on SR 41 From Vultee Blvd. To Jupiter Drive (L.M. 22.50-22.96)

  • Monday, November 27 through Saturday, November 2, 9AM-3PM, There will be a lane closure for widening of the median on Murfreesboro Pike. At least one lane will remain open.

DAVIDSON COUNTY, Bridge Repair on SR 65 over the Earthman Fork Creek near Old Hickory Boulevard/Fontanel Mansion (L.M. 6.02 – 6.08)

  • From now through November 2017, There will be a lane closure on SR 65 for bridge work. The bridge traffic will be controlled by temporary traffic signals.

DAVIDSON COUNTY, Resurfacing On SR 11 (Dickerson Pike) From South of SR 155 (Briley Pkwy) To SR 45 (Old Hickory Blvd) (L.M. 17.40-19.40)

  • Daily, 9AM-3PM, There will be alternating lane closures on SR 11 in both directions for pavement marking operations. At least one lane will remain open at all times.

DICKSON/WILLIAMSON COUNTY, Construction On I-40 Eastbound Near (M.M. 180) For A Truck Climbing Lane

  • Nightly, 8PM-6AM, There will be a temporary lane closures on I-40 eastbound from MM 179-183 in order to set barrier rail.

ROBERTSON COUNTY, Road Intersection Improvements At SR 49 & York Road (L.M. 0.00-0.51)

  • Monday, November 27 through Wednesday, November 29, 8:30AM-3:30PM, There will be temporary lane closure on SR 49  for loop wire installation.

ROBERTSON COUNTY, Resurfacing Of I-65 From The Sumner County Line To South Of The Bridge Over Honey Run Creek

  • Nightly, 8PM-5AM, There will be a temporary lane closure on I-65 in both directions from MM 103-120 to perform striping and paving.

RUTHERFORD COUNTY, Construction of Turning Lanes on SR 96 at the I-24 Westbound Exit Ramp (Exit 78-B) (L.M. 9.52 – L.M. 9.68)

  • Daily, 9AM-3:30PM, There will be a lane and shoulder closure on SR 96 eastbound between I-24 and N. Thompson Lane as well as on the I-24 westbound exit ramp (78B) for grading and signal operations in the median.

SMITH COUNTY, Construction Of A Truck Climbing Lane On I-40 In Smith County

  • Monday, November 27 and Tuesday, November 28, 8PM-6AM, There will be an outside lane closure on I-40 eastbound at MM 251-253 for milling and paving of the outside shoulder for phase 1 traffic control. At least one lane will remain open.

SMITH COUNTY, Rockfall Mitigation on SR 25 (L.M. 8.5)

  • From now until further notice, There will be a road closure on SR 25 for rockfall mitigation. Detour routes are in place. Get more information here:  http://www.tn.gov/tdot/news/53979

SUMNER COUNTY, Resurfacing SR 76 (Portland White House Rd.) Beginning at SR 25 & Extending To SR 109 (L.M. 3.91-10.34)

  • Daily, 9AM – 3PM and Nightly, 7:30PM-6AM, There will be a temporary lane closure on SR 386 for guardrail operations. One lane will remain open.

TROUSDALE COUNTY, Resurfacing SR 10 (US 231) Beginning At Wilson County Line & Extending To SR 25 (L.M. 0.00-6.24)

  • Daily, 6AM-5PM, There will be a lane closure on SR 10 (US 231) for paving operations. One lane will remain open.

WILLIAMSON COUNTY, Resurfacing On SR 106 (Lewisburg Pike) From SR 397 (Mack C Hatcher Memorial Parkway) (L.M. 12.48) To SR 96 (L.M. 14.86)

  • Daily (excluding weekends), 9AM-3PM, There will be a lane closure in both directions on SR 106 (Lewisburg Pike) for pavement marking. At least one lane will remain open.

WILLIAMSON COUNTY, Grading, Drainage, & Paving Work On SR 6 (Franklin Road) From South Of Moores Lane (L.M. 15.93) To Concord Road (L.M. 18.53)

  • Daily, 9AM-3PM (Excluding weekends), There will be alternating temporary lane closures and/or intermittent stoppages (one direction at a time) on SR 6 in both directions for the installation of changeable message boards, staking/flagging of limits, asbestos abatement, & start of clearing/grubbing. At least one lane will remain open at all times.

Maintenance & Utilities

DAVIDSON COUNTY

Monday, November 27 through Wednesday, November 29, 8PM-5AM, There will be moving lane closures on I-40 eastbound from MM 194-226 for street sweeping. At least one lane will remain open at all times.

Daily (excluding weekends), 9AM-3PM, There will be a shoulder and lane closure on  SR 1 (Murfreesboro Pike) in both directions at Expressway Park for potholing and directional drilling work. There will be a shoulder and lane closure in both directions on SR 1 (Lafayette St.) at Charles E. Davis Blvd. for utility work.     

Nightly, 8PM-5AM, There will be alternating lane closures on I-440 in both directions for bridge inspections and survey work. There will be one lane open at all times.

Thursday, November 12, 6:30AM-11:30AM, There will be a right lane closure on Harding Pike from Belle Meade Boulevard to Hillwood Boulevard for the purpose of foot traffic security during the Boulevard Bolt 5K race on Thanksgiving. Left and turning lane will remain open.

GILES COUNTY

Monday, November 27 through Wednesday, November 29, 8PM-6AM, There will be a right lane closure from MM 15-22 in both directions for milling & paving operations.

SUMNER COUNTY

Monday, November 27 through Wednesday, December 6, 9AM-3PM, There will be alternating lane closures on SR 174 at the intersection of Big Station Camp Road/Carrellton Drive for installation of signals and mast arms. At least one lane will remain open in each direction.

Motorists are encouraged to use caution and obey reduced speed limits in all TDOT work zones, regardless of lane closure activity.  Information in this report is provided to the Department of Transportation by the contractors.  Most work is weather dependent and subject to change due to inclement weather. 

From your desktop or mobile device, get the latest construction activity and live streaming SmartWay traffic cameras at www.TNSmartWay.com/Traffic. Travelers can also dial 511 from any land-line or cellular phone for travel information, or follow us on Twitter at www.twitter.com/TN511 for statewide travel. 

As always, drivers are reminded to use all motorist information tools wisely and Know Before You Go! by checking travel conditions before leaving for your destination.  Drivers should never tweet, text or talk on a cell phone while behind the wheel.

###

Road Closures |Transportation

Read From Source… [State of Tennessee Newsroom]

TennesseeWatchman.com

 if the watchman sees the sword coming and does not blow the trumpet, and the people are not warned, and the sword comes and takes any person from among them, he is taken away in his iniquity; but his blood I will require at the watchman’s hand.

Disclaimer:

Opinions posted on TennesseeWatchman.com are those of the individual posters and do not necessarily represent the opinion of TennesseeWatchman.com or its management. All materials posted herein are protected by copyright law and the exemption for fair use of copyrighted works.
%d bloggers like this: